This page was exported from Exam for engine [ http://blog.test4engine.com ] Export date:Mon Nov 18 2:30:02 2024 / +0000 GMT ___________________________________________________ Title: Test4Engine PSPO-I Exam Questions Real PSPO-I Practice Dumps [Q244-Q262] --------------------------------------------------- Test4Engine PSPO-I Exam Questions | Real PSPO-I Practice Dumps Verified PSPO-I Exam Dumps Q&As - Provide PSPO-I with Correct Answers NO.244 The Scrum Master shouldn’t allow the developers to start working without having the tasks identified and assigned.  True  False NO.245 Is it allowed to forcast the Sprint progress using burn-up charts, following Scrum?  NO  YES NO.246 What is the main accountability (roles = outdated term) of a Project Manager in Scrum?  Supporting the Product Owner.  Tracking the progress of a Release.  There are no Project Managers in Scrum.  Managing Risks. NO.247 When n Scrum teams are working on a product, there should always be only 1 Product Owner but 1-n Scrum Masters.  False  True NO.248 Does it replace the importance of empiricism in Scrum to forecast the Sprint progress using cumulative flows?  YES  NO NO.249 Which statements are true about Scrum artifacts?  Scrum artifacts are designed to maximize transparency of key information.  Scrum’s artifacts represent work or value.  Scrum’s artifacts represent work or revenue. NO.250 What is the perfect number of hours a Developer should work in a week?  As long as it is needed.  A maximum of 40 hours per week.  It is required to work at a constant pace.  Between 40 and 60 hours per week. NO.251 The Sprint Backlog is a plan by and for the Developers.  TRUE  FALSE NO.252 What happens with “Done” Sprint Backlog items when a Sprint was cancelled?  All of them are put back into the Product Backlog.  All of them are released.  “Done” Product Backlog items are reviewed and released if accepted by Product Owner. NO.253 Is it required to do testing tasks, necessary to achieve the Product Goal within the Sprint?  YES  NO NO.254 The length of a Sprint should be:  All answers are correct.  Short enough to have many learning cycles and limit risk of cost and effort.  Fixed (one month or less) to create consistency.  Short enough that the Sprint Goal not becomes invalid. NO.255 When is is allowed to cancel a Sprint?  When the Scrum Master decides to cancel it.  When the Product Manager requires it.  When the Developers decide to cancel it.  When the Sprint Goal becomes obsolete.  A running Sprint cannot be cancelled. NO.256 What test types should be done during the Sprint?  Acceptance tests  Every type of test  Unit tests NO.257 Which statement describes best how the Product Backlog is impacted by changes in the product environment?  The Product Backlog should always follow the Product Owners plan and should not reflect the changes at all.  The Product Backlog should be very high level and therefore tolerate such changes.  The Product Backlog should evolve and reflect the environment changes. NO.258 What are the advantages of shorter Sprints?  Limit risk of cost and effort.  Higher quality.  More learning cycles.  More team commitment. NO.259 Which 2 of the following are an indication for an item to be ready for development?  The item is refined and small enough to fit in one Sprint.  All stakeholder have agreed to prioritize it.  The item is estimated (e.g. in Story Points).  The item is smaller than 15 Story Points. NO.260 The Product Owner has to maximize the value – more features always bring more value. Therefore, the Product Owner has to maximize the number of features in a sprint.  True  False NO.261 The Product Owner is not available and cannot answer the developers questions before the Sprint Planning. Therefore, the developers feel a high level of uncertainty to make a reliable forecast .What should the team do?  Extend the duration of the current Sprint and try to answer all questions.  The Sprint Planning meeting should be cancelled or postponed.  The upcoming Sprint should be cancelled.  The developers should make a best guess and should not worry too much. NO.262 Where is an evolving environment reflected in Scrum?  In the number of Product Owners assigned to the Team.  In the Scrum Team salary.  In the Product Backlog.  Loading … Get Top-Rated Scrum PSPO-I Exam Dumps Now: https://www.test4engine.com/PSPO-I_exam-latest-braindumps.html --------------------------------------------------- Images: https://blog.test4engine.com/wp-content/plugins/watu/loading.gif https://blog.test4engine.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2023-07-09 15:35:53 Post date GMT: 2023-07-09 15:35:53 Post modified date: 2023-07-09 15:35:53 Post modified date GMT: 2023-07-09 15:35:53