Exam for engine
https://blog.test4engine.com/2023/10/15/updated-hitachi-hqt-4180-certification-exam-questions-q19-q37/
Export date: Mon Nov 18 2:45:18 2024 / +0000 GMT

[UPDATED] Hitachi HQT-4180 Certification Exam Questions [Q19-Q37]




[UPDATED] Hitachi HQT-4180 Certification Exam Questions

Quickly and Easily Pass Hitachi Exam with HQT-4180 real Dumps

QUESTION 19
A customer has a VSP G370 with the encryption license key installed. They now want to have all the DP-Volumes of a certain pool located on encrypted RAID Groups.
What are two requirements? (Choose two.)

 
 
 
 

QUESTION 20
How many batteries does a VSP E1090 have per controller (CTL)?

 
 
 
 

QUESTION 21
What are two valid back-end SAS cable connections on a VSP midrange system? (Choose two.)

 
 
 
 

QUESTION 22
One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.
What are two requirements to separate the I/Os of the servers? (Choose two.)

 
 
 
 

QUESTION 23
Which three RAID configurations are supported by VSP Midrange systems? (Choose three.)

 
 
 
 
 

QUESTION 24
What are two consequences when a “New Installation” procedure is performed on a VSP Midrange system? (Choose two.)

 
 
 
 

QUESTION 25
What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?

 
 
 
 

QUESTION 26
Which tool is used for the remote monitoring of a VSP N800 system?

 
 
 
 

QUESTION 27
Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)

 
 
 
 

QUESTION 28
You are installing a VSP F370 and you need to connect your laptop to one of the controllers.
What are the two default IP addresses of the maintenance ports of CTL1 and CTL2? (Choose two.)

 
 
 
 

QUESTION 29
Which tool do you use to install license keys on a VSP G370 system?

 
 
 
 

QUESTION 30
Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.) Choose 2 answers

 
 
 
 

QUESTION 31
You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration.
Which set of IP addresses is configured with the ISW?

 
 
 
 

QUESTION 32
A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?

 
 
 
 


Hitachi HQT-4180 exam is an excellent opportunity for professionals to demonstrate their expertise in installation and configuration of Hitachi Vantara's VSP Midrange Family storage solutions. It is a globally recognized certification that can help individuals advance their careers and achieve their professional goals in the field of data storage and management.

 

Start your HQT-4180 Exam Questions Preparation: https://www.test4engine.com/HQT-4180_exam-latest-braindumps.html 1

Links:
  1. https://www.test4engine.com/HQT-4180_exam-latest-b raindumps.html
Post date: 2023-10-15 15:35:46
Post date GMT: 2023-10-15 15:35:46

Post modified date: 2023-10-15 15:35:46
Post modified date GMT: 2023-10-15 15:35:46

Export date: Mon Nov 18 2:45:18 2024 / +0000 GMT
This page was exported from Exam for engine [ http://blog.test4engine.com ]