An architect is tasked with expanding an existing VMware software-defined data center (SDDC) solution so that it can be used to deliver a virtual desktop infrastructure (VDI) service off-shore development activities.
The production environment is currently delivered across two geographically dispersed data centers. The two data centers are currently connected to each other through multiple diversely routed, high bandwidth and low latency links. The current operations management components are deployed to a dedicated management cluster that is configured with N+1 redundancy. The current VMware software-defined data center (SDDC) has a monthly availability target of 99.5%, which includes all management components.
The customer requires that the new solution scale to support the concurrent running of 500 persistent virtual desktops. The virtual desktops must not share the same virtual infrastructure as existing virtual machines, but can be managed using the same VMware operations management components. Any new VDI service management components must be installed into the management cluster. There is no requirement to back up the virtual desktops because all relevant user data is stored centrally. The VDI service is providing business critical services and must have an availability target of 99.9%.
Given the information from the customer, which two assumptions would the architect include in the design? (Choose two.)

 
 
 
 
 

QUESTION 12
A VMware Service Provider is tasked with delivering a solution for continuous availability for a subset of Tier 1 virtual machines (VMs) and vApps running in their vSAN environment. The VMs make up a mission-critical application and there can be no data loss in the event of an outage at their primary data center. In the event of a regional outage, they have established a 10-minute recovery point objective (RPO). Failover/failback to the third site must be automated.
They have the following in place:
Two local data centers (primary and secondary) connected with 100 Gb dedicated fiber
2ms round-trip time (RTT) latency between the sites
A third data center located on another power grid
70ms latency between the primary and secondary data centers
Matching storage arrays at all locations
Which two solutions could be used to meet the requirements? (Choose two.)

 
 
 
 
 

QUESTION 13
Following a recent acquisition, an architect needs to merge IT assets into its current data center. The combined vSphere environment will need to run the newly acquired company’s virtual machines.
Network integration work has already been completed and the current environment has capacity to host all virtual machines. The Operations team needs to identify which virtual machines belong to the acquired company and report on their usage.
How should the architect merge the company’s assets and virtual machines?

 
 
 
 

QUESTION 14
During a requirements gathering workshop, the customer provides the following requirement that is pertinent to the design of a new vSphere environment:
The Maximum Tolerable Downtime (MTD) for all Tier 1 applications is one hour.
Which requirement classification is being gathered for the design documentation?

 
 
 
 

QUESTION 15
There is a request for approved virtual machine applications through a new vSphere platform’s integrated automation portal. The platform was built following all provided company security guidelines and has been assessed against Sarbanes-Oxley Act of 2002 (SOX) regulations.
The platform has the following characteristics:
vRealize Operations is being used to monitor all clusters.
There is a dedicated ESXi cluster, supporting all management services.
All network traffic is via distributed virtual switches (DVS).
There is a dedicated ESXi cluster for all line-of-business applications.
Network traffic is serviced by NSX-T.
There is a dedicated ESXi cluster for virtual desktop infrastructure (VDI).
Network traffic is serviced by NSX-T.
The application owner is requesting approval to install a new service that must be protected as per the Payment Card Industry (PCI) Data Security Standard.
Which additional non-functional requirement should the architect include in the design to support the new service?

 
 
 
 

QUESTION 16
An architect is designing a VMware software-defined data center (SDDC) solution based on the following customer requirements:
The solution must initially support 1,000 virtual machines
The solution must scale to support the concurrent running of up to 5,000 virtual machines The production environment should be delivered across two data centers The solution should have a maximum tolerable downtime (MTD) of four hours The solution should have a monthly service availability target of 99.8% Which two assumptions could the architect make based on the information from the customer to help size the solution? (Choose two.)

 
 
 
 
 

QUESTION 17
Refer to the exhibit.
During a requirements gathering workshop, the architect shares the following diagram:

What should the architect recommend for guaranteed throughput for each service?

 
 
 
 

QUESTION 18
An architect is preparing a design for a customer. Based on requirements, the architect recommends an HCI- based infrastructure with all-flash architecture. During the assessment, it is confirmed that the network throughput generated by virtual machines does not exceed 150 Mb/s.
What is the minimum number and type of network adapters in each server that the architect can recommend to ensure requirements are met and there is no single point of failure?

 
 
 
 

QUESTION 19
An architect is reviewing a physical storage design. The customer has specified that a new active-passive based storage array will be used to provide storage for the vSphere clusters.
Which configuration should for the architect recommended?

 
 
 
 

QUESTION 20
A architect is designing a new VMware software-designed data center (SDDC) using vSphere 7 to meet the following requirements:
The SDDC must be deployed at two locations: primary and secondary.
vSphere Replication must be used to replicate virtual machines between the two locations.
Site Recovery Manager must be used to orchestrate disaster recovery (DR) activities.
One single-sign on (SSO) domain must be used to authenticate access at both locations.
Which design decision should the architect make to meet these requirements?

 
 
 
 

QUESTION 21
Which design decision must be included in a design to allow for the deployment of a minimum supported configuration of vCenter High Availability (HA)?

 
 
 
 

QUESTION 22
An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image. All hosts within the cluster have the same CPU and memory capacity.
Which ESXi deployment method should the architect use?

 
 
 
 

QUESTION 23
An organization’s existing vSphere environments are configured for Enhanced Linked Mode. The DevOps team automates the creation of hardened virtual machine images for various operating systems. Their continuous integration/continuous delivery (CI/CD) pipeline runs a task at the end of a successful build, which uploads the Open Virtualization Format (OV) image to a sandbox content library, deploys a virtual machine from the image, and then destroys these objects after quality checks are complete.
The following requirements have been noted:
All content libraries and images must be centrally created and managed.
All images must be capable of being updated.
All images must be refreshed and available to subscribed libraries within 24 hours.
All images must provide details of the image contents and versions.
All images must be capable of being reverted to a previous version.
All images must be capable of having the hardware and guest operating system customized during deployment.
Which three recommendations should the architect make to design a content library solution that will meet these requirements? (Choose three.)

 
 
 
 
 
 

QUESTION 24
An architect is reviewing a physical storage design. The customer has specified that storage DRS will be used for ease of operational management for capacity and performance.
Which recommendation should the architect include in the design?

 
 
 
 

QUESTION 25
An architect is designing a new vSphere environment to meet the following requirements:
The environment must support 5,000 virtual machines.
The environment will be built initially using 350 hosts.
Which vCenter Server appliance deployment size should the architect specify for the design?

 
 
 
 

QUESTION 26
A customer requires the use of data encryption to ensure data is not accessible when a drive is removed from the primary storage platform. However, there is also a requirement to use deduplication and compression against all workloads in order to conserve space.
Which solution meets the customer requirements?

 
 
 
 

QUESTION 27
An architect is designing an environment for a retail customer. The design will use a single small vCenter Server Appliance and a cluster of eight ESXi hosts at a remote site. There is a single 10 GbE connected network at the remote site to support all management services. It is not possible to create additional management networks at the remote site. Virtual machine backups at the site will be dependent on the vCenter Server being available.
Which design decision should the architect make to maximize availability for backups?

 
 
 
 

QUESTION 28
A customer has a database cluster with 40/60 read/write ratio and a high IOPs requirement with no contention on an all-flash vSAN cluster.
Which two storage settings should be configured for best performance? (Choose two.)

 
 
 
 
 

QUESTION 29
An architect is considering placement of virtual machines within an existing VMware software-defined data center (SDDC).
During the discovery phase, the following information is documented:

Which two recommendations should the architect make for placement of the virtual machines to meet resource profile requirements? (Choose two.)

 
 
 
 
 

QUESTION 30
Refer to the exhibit.
During a requirements gathering workshop, the architect shares the following diagram:

What should the architect recommend for guaranteed throughput for each service?

 
 
 
 

What is the duration, language, and format of the VMware 3V0-21.21 Certification Exam

  • Passing score:70%
  • Length of Examination: 2 hours
  • Number of Questions: 150
  • Language: English or French
  • Format: Multiple choices, multiple answers

 

Prepare Important Exam with 3V0-21.21 Exam Dumps: https://www.test4engine.com/3V0-21.21_exam-latest-braindumps.html

         

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below