This page was exported from Exam for engine [ http://blog.test4engine.com ] Export date:Mon Nov 18 2:51:44 2024 / +0000 GMT ___________________________________________________ Title: Free 2024 APICS Certification CPIM dumps are available by Test4Engine [Q30-Q54] --------------------------------------------------- Free 2024 APICS Certification CPIM dumps are available on Google Drive shared by Test4Engine Welcome to download the newest Test4Engine CPIM PDF dumps: https://www.test4engine.com/CPIM_exam-latest-braindumps.html ( 590 Q&As) QUESTION 30is the number of periods 1, in which changes are not expected due to excessive cost caused by schedule disruption.  Projected available balance  Demand time fence  Scheduled receipt  ATP (available o promise) QUESTION 31What is calculated by taking into account the work center utilization and efficiency?  actual rate of production  Rated capacity  resource availability  None of the above QUESTION 32A work center consists of four machines and is operated 8 hours per day for 5 days a week. Historically, the utilization has been 85% and the efficiency 110%.what is the rated capacity?  150 standard hours  149.6 standard hours  180.5 standard hours  160.9 standard hours QUESTION 33Over the time span of the production plan, large changes in capacity are usually not possible. Additions or subtractions in plant and equipment are impossible or very difficult to accomplish in this period. However, some changes can be done. Which of the following are out of those variations?  People can be hired and laid off, overtime and short-time can be worked, and shifts can be added or removed.  Inventory can be built up in slack periods and sold or used in periods of high demand.  Work can be subcontracted or extra equipment leased  All of these QUESTION 34Capacity is the quantity of work done and not the rate of doing work.  True  False QUESTION 35Life cycle approach for identifying order winners and qualifiers is complicated in that:  The duration of life cycle will be very different for different products.  Customer needs change work frequently  Life cycle phase are difficult to understand  Not a single requirement applies to all these of life cycle QUESTION 36If the cost of direct material is 60%, direct labor is 10%,and overhead is 25%of sales. How much to give the same increase in profit? (Remember overhead cost is constant)  19%  18%  17%  13% QUESTION 37MRP and CRP should form part of a/an?  Open system  Closed-loop system  Balanced system  Workable plan that meets the priority objectives QUESTION 38Forecasted ActualThis forecast performance is best described as:  biased  Random Error  Efficient  Naive QUESTION 39Continuous improvement does not focus on a “one-shot” improvement out on such things as:  Rate on improvement in quality  Cost and cost  Reliability, innovation, effectiveness and productivity  All of these QUESTION 40Who is responsible for determining the capacity needed to achieve the priority plans as well as providing, monitoring, and controlling that capacity so the priority plan can be met?  Capacity Running  Capacity Board  Capacity Organization  Capacity Management QUESTION 41Utilization can be determined from:  Historical records  Work sampling study  Efficiency  Both A And B QUESTION 42Which four primary plant types are defined, and they are used to specify the flow of materials through a production process?  I-plant, A-plant, B-plant, G-Plant  I-plant, A-plant, V-plant, T-Plant  C-plant, K-plant, B-plant, S-Plant  A-plant, D-plant, B-plant, F-Plant QUESTION 43Scheduled receipts shows:  The quantities ordered  When quantities ordered are expected to be completed  When quantities ordered are expected to be available  All of the Above QUESTION 44Metrics give us:  Control by supervisors  Reporting of data to supers and external description  Product description  Process specification QUESTION 45Price competition is often severe and profits start to decline, in which phase of the life cycle of a product?  Introduction phase  Growth phase  Maturity phase  Decline phase QUESTION 46What is responsible for executing the master production schedule and the material requirements plan?  Production activity control  Production requirement plan  Standard production  Master production plan QUESTION 47For example, the price for a certain type of product must full within a range for the suppliers to be considered .but being considered does not mean winning the order. so win orders a supplier must have characteristics that encourage customers to choose its products and services over competitors. Those competitive characteristics, or combination of characteristics are called  Order takers  Order achievers  Order winners  Order credentials QUESTION 48Production must keep its operating cost as low as possible this can be done in the following way/ways:  Make long production runs of relatively few production runs of relatively few products. Fewer Changeovers will be needed and specialized equipment can be used thus reducing the cost of making the product  Maintain high inventories of raw materials and work-in-process so production is not disrupted by shortages.  Manufacture only to customer order  Provide lowest distribution costs QUESTION 49The formula for the planned backlog for period 1 is calculated as:  Planned backlog for period 1 = Planed backlog + previous input – planned output  Planned backlog for period 1 = Planed backlog + previous output – planned output  Planned backlog for period 1 = Previous backlog + planned input – planned output  Planned backlog for period 1 = Actual backlog + planned input – actual output QUESTION 50Goods making up a single order are brought together and checked for omissions or errors, this is known as:  Dispatch shipment  Marshal the shipment  Operate the shipment  Receive the shipment QUESTION 51Which of the following is NOT the dimension to quality measurements?  Function  Aesthetic  Production  Accuracy QUESTION 52If demand or lead time is greater than forecast, then what will occur?  Invaluable stock  Unpredictable stock  Stockout  Vulnerable stock QUESTION 53The time needed to perform operation is an important input factor to the manufacturing planning and control system. It is needed to schedule work through the plans,  Load the plant  Make delivery promises  And cost the product  All of these QUESTION 54The function of selecting and sequencing available jobs to be run at individual work centers is known as:  Sequencing  Decentralization  Dispatching  Devolution  Loading … What is the cost of APICS CPIM: Certified in Production and Inventory Management Exam APICS CPIM: Certified in Production and Inventory Management Exam costs at $250, for extra information visit APICS website.   Tested Material Used To CPIM: https://www.test4engine.com/CPIM_exam-latest-braindumps.html --------------------------------------------------- Images: https://blog.test4engine.com/wp-content/plugins/watu/loading.gif https://blog.test4engine.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2024-01-06 10:37:57 Post date GMT: 2024-01-06 10:37:57 Post modified date: 2024-01-06 10:37:57 Post modified date GMT: 2024-01-06 10:37:57