NEW QUESTION 73
What is the air change requirement for a tunnel of 610 m (2000 ft) long with a diameter of 3.4 m (11 ft)?

 
 
 
 
 

NEW QUESTION 74
To increase its presence and promote its products and services in new markets, a company begins to implement its new business strategy. The company’s CEO endorses a new program to promote and support this strategy However before the program is formally initialed, this strategy must be aligned with the organization’s strategic goals and objectives.
What should the program manager develop first?

 
 
 
 

NEW QUESTION 75
The program manager defines the program objectives, requirements and develops a high-level road map. To ensure program alignment with the enterprise strategic plan the program manager should work with which of the following?

 
 
 
 

NEW QUESTION 76
When designing a video communications network, which type of video communication link is two-person videoconferencing?

 
 
 
 
 

NEW QUESTION 77
A program receives initial approval from the selection committee to proceed with the program development.
What should the program manager do next”?

 
 
 
 

NEW QUESTION 78
A program to implement a company’s new system is nearing completion and the program manager attempts to close the program However, despite training provided to the operational staff on the new system, there is concern that the defined expected benefits will not be fully realized.
To prevent this concern in the future, which of the following should occur?

 
 
 
 

NEW QUESTION 79
A program manager is working with the sponsor, stakeholders, and steering committee to formulate a program’s benefits sustainment and transition plan What should the program manager do to create this plan?

 
 
 
 

NEW QUESTION 80
Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)

 
 
 
 
 

NEW QUESTION 81
What is the MAXIMUM number of work areas served by a single Multiuser Telecommunications Outlet Assembly (MUTOA)?

 
 
 
 

NEW QUESTION 82
A program experiences issues during execution. The stakeholders are concerned and the program manager feels pressure to act on these issues.
What tool should be used to trigger a planned response when receiving lower than expected results’?

 
 
 
 

NEW QUESTION 83
The customer of a three-year program does not want to receive any intermediate details on the program. The program appears to be in trouble and the customer is concerned about a new system’s cost. The program manager has provided monthly performance reports throughout the program’s lite cycle.
Which of the following would the customer be interested in reviewing?

 
 
 
 

NEW QUESTION 84
During a program’s definition phase, it is determined that the best approach for delivering the programs intended benefits is to supplement corporate resources with the procurement of specific products and services from external suppliers. The program manager should use which of the following to determine and/or document the results of the program procurement planning activity?

 
 
 
 

NEW QUESTION 85
When sizing an underground entrance facility, what is the MINIMUM amount of 103 metric designator conduits (4 trade size) that should be specified by the ICT distribution design?

 
 
 
 

NEW QUESTION 86
When estimating an ICT distribution designer project timeline schedule based on the scope of work which two scheduling methods use network diagrams lo integrate logical activities and identify critical paths on the project? (Select two options.)

 
 
 
 
 

NEW QUESTION 87
A municipal agency manages a city’s water and wastewater infrastructure. A regulation requires the replacement of sewer lines throughout the city at a cost of US$2 billion over 30 years The city has been managing this program with various program teams, and has a project controls office In place to track protects separate from the program management team A program manager is hired to standardize all deliverables from component projects under the program.
What should the program manager do next?

 
 
 
 

NEW QUESTION 88
A program is developing a next-gene ration product line, and one component has been delivered. However, due to a change request, expectations for another component are unmet What activity should the program manager perform next?

 
 
 
 

NEW QUESTION 89
The program manager must define the program and understand the organization’s target market and customer needs. What should the program manager do first?

 
 
 
 

NEW QUESTION 90
Which two of the following items should be considered for inclusion in a comprehensive working outline of a SoW? (Select two options.)

 
 
 
 
 

NEW QUESTION 91
Coupling with electrical circuits can create inductive interference to telecommunications facilities. Which of the following can decrease the coupling effect?

 
 
 
 

NEW QUESTION 92
In specifying labels and pruned tags that meet Underwriters Laboratories (UL) 969 Standard, marking and labeling systems are provided following the listed metrics. Which two of the following are REQUIRED for the UL standard? (Select two options.)

 
 
 
 
 

NEW QUESTION 93
Which of the following statements Is CORRECT concerning best practice for horizontal cable management panels?

 
 
 
 

NEW QUESTION 94
The program selection committee presents several programs for approval:

Which program was selected based solely on a three-year return on investment?

 
 
 
 

NEW QUESTION 95
A program manager recognizes that a successful resource being used in project A could also be used in project B.
What should the program manager do first to leverage the utilization of this resource?

 
 
 
 

BICSI RCDDv14 Exam Syllabus Topics:

Topic Details
Topic 1
  • Conduct final ICT inspections to ensure standard and code compliance, design intent, and
  • or client requirements are met
Topic 2
  • Review ICT bids
  • tenders for completeness to the Request for Proposal (RFP) response and compliance to the design
Topic 3
  • Design ICT telecommunication spaces to ensure standards compliance and
  • or client requirements are met
Topic 4
  • Perform field engineering
  • observations to clarify and provide direction to the installer as to where issues exist
Topic 5
  • Calculate (size) ICT horizontal pathways to ensure standards and code compliance and
  • or client requirements are met
Topic 6
  • Produce ICT Bill of Materials
  • List of Materials (BOM
  • LOM) for the project stakeholders
Topic 7
  • Participate in the procurement of ICT materials to ensure the materials match the submittals
  • Define scope of ICT Design

 

New RCDDv14 Dumps – Real BICSI Exam Questions: https://www.test4engine.com/RCDDv14_exam-latest-braindumps.html

         

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below