QUESTION 23
A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

 
 
 
 

QUESTION 24
A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies, where would CO2 monitors need to be located?

 
 
 
 

QUESTION 25
In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens

 
 
 
 

QUESTION 26
During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

 
 
 
 

QUESTION 27
A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum Energy Performance, what option is used?

 
 
 
 

QUESTION 28
During a review of the HVAC equipment submittal, the Commissioning Authority (CxA) determined that the contractor substituted a higher efficiency piece of equipment. Which of the following is the priority for the CxA to consider?

 
 
 
 

QUESTION 29
Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?

 
 
 
 

QUESTION 30
Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?

 
 
 
 

QUESTION 31
A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?

 
 
 
 

QUESTION 32
What percentage of a building’s surface area may be excluded from the calculation for Materials and ResourcesCredit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because ofdeterioration or damage when maintaining existing building structure, enclosure and interior structural elements?

 
 
 
 

QUESTION 33
Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the conventional approach for rainwater management by

 
 
 
 

QUESTION 34
Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

 
 
 
 

QUESTION 35
According to the Integrative Process Credit, the discovery phase of energy-related systems should identify

 
 
 
 

QUESTION 36
What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

 
 
 
 

QUESTION 37
A project’s total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?

 
 
 
 

QUESTION 38
When calculating the reverberation time of a room, which of the following pieces of information is least relevant?

 
 
 
 

QUESTION 39
Which of the following products are eligible for a WaterSense label?

 
 
 
 

QUESTION 40
Which rating system is being used if all of the credits below have been submitted towards certification?
– Location and Transportation Credit, Reduced Parking Footprint
– Energy and Atmosphere Credit, Fundamental Refrigerant Management
– Indoor Environmental Quality Credit, Acoustic Performance
– Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction – Lead, Cadmium, and Copper

 
 
 
 

QUESTION 41
An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?

 
 
 
 

QUESTION 42
Which of the following groups of documents is most likely to support both Indoor Environmental Quality Credit, Thermal Comfort, and Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

 
 
 
 

QUESTION 43
Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?

 
 
 
 

QUESTION 44
According to the Integrative Process Credit, the discovery phase of energy-related systems should identify

 
 
 
 

QUESTION 45
A contractor is building a retirement community project. 30% of the building’s product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?

 
 
 
 

QUESTION 46
A project team compares a life-cycle assessment (LCA) model to a baseline design to determine the reductions in six impact categories. One impact category exceeds the baseline by 7%. Which alternative analyses should the team run to check different impact measurements?

 
 
 
 

USGBC LEED-AP-BD-C Exam Syllabus Topics:

Topic Details
Topic 1
  • Integrative Strategies: It emphasizes the importance of an integrative process. The topic also covers their knowledge about the value of teamwork in developing integrative green strategies and how they can collaborate throughout different project phases.
Topic 2
  • Location and Transportation: This topic measures the skills of LEED Green Associates in sustainable development. It addresses critical factors in site selection, including development constraints and opportunities related to environmental considerations, and community connectivity concepts, such as walkability and street design, which are vital for promoting sustainable transportation options.
Topic 3
  • Water Efficiency: This topic measures the skills of LEED Green Associates in optimizing water use in building projects. It explores strategies for reducing outdoor water use through efficient irrigation practices, including landscape water requirements and irrigation systems. It also covers using native and adaptive plant species to minimize irrigation demands.
Topic 4
  • Energy and Atmosphere: In this topic, LEED Green Associates focuses on building reuse, including historic building renovations. It covers material reuse strategies, enclosure materials, and permanently installed interior components into new designs.
Topic 5
  • Sustainable Sites: It covers site assessment and planning that involves evaluating various site characteristics, such as topography, hydrology, climate, vegetation, and soil conditions. It also covers assessing a site’s potential as a resource for energy flows while addressing construction activity pollution prevention measures.

 

LEED-AP-BD-C Dumps Ensure Your Passing: https://www.test4engine.com/LEED-AP-BD-C_exam-latest-braindumps.html

         

Related Links: telegra.ph myportal.utt.edu.tt scalar.usc.edu telegra.ph learn.csisafety.com.au annualeventpost.com

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below