NEW QUESTION 29
Which of the following images shows the appropriate tool to measure the slump of concrete?

 
 
 
 

NEW QUESTION 30
What are the coordinates of the valve in the imagebelow?

 
 
 

NEW QUESTION 31
A project manager is aware of a faulty fall protection railing. The safety issue is reported but not remedied or documented. In the event of an incident, what is the maximum penalty for the first offence under the Occupational Health and Safety Act?

 
 
 
 

NEW QUESTION 32
EXCERPT FROM MUNICIPAL BYLAW 1234 – ZONING
Section 3: Single family zone
3.1 All dwellings shall house one family.
3.2 All dwellings shall have a minimum main floor area of 120 m².
3.3 All dwellings shall be constructed a minimum of 10.0 m from the front property line, 15.0 m from the rear property line, and 1.5 m from the side property lines.
3.4 An application that does not fulfill the above requirements shall be referred to Council.

 
 
 
 

NEW QUESTION 33
A civil engineering technologist who works for a structural consulting firm discovered a conflict between the design and existing site conditions during the construction stage of the project. What type of site instruction should the technologist provide to the contractor to resolve the conflict?

 
 
 
 

NEW QUESTION 34
For a land development project to be initiated, which of the following documents must be submitted to the municipality for approval?

 
 
 
 

NEW QUESTION 35
An engineered wooden “I” floor joist has a hole that was cut at the bearing location. What is the best way to verify that the structural integrity of the joist has not been compromised?

 
 
 
 

NEW QUESTION 36
In an oil and gas project, the location of a pile is offset by 78 mm north and 54 mm east of the key location plan. The location was stamped and issued for construction by a consulting engineering company. The statement on the drawings says, “Offset more than 75 mm is not accepted.” Which of the following is the best approach for the civil engineering technologist to take?

 
 
 
 

NEW QUESTION 37
When should soil compaction tests be completed?

 
 
 
 

NEW QUESTION 38
A civil engineering technologist is taking a sample of concrete cylinders from a truck. When should the sample be taken?

 
 
 
 

NEW QUESTION 39
What test should be used to determine the compressive strength of concrete?

 
 
 
 

NEW QUESTION 40
What is the main reason for taking handwritten notes while surveying?

 
 
 
 

NEW QUESTION 41
In which step in this diagram will a general contractor need to consider their bonding capacity?

 
 
 
 

NEW QUESTION 42
What would be the best step for an engineering team to propose to a client when reviewing a concept before a project is initiated?

 
 
 
 

NEW QUESTION 43
A 500 mm diameter corrugated steel culvert conveys storm water under a road. The inlet end projects from the road embankment fill. How much flow (m³/s) can the culvert handle before the headwater depth is greater than the culvert diameter?

 
 
 
 

NEW QUESTION 44
The graph below is used for tracking progress and costs of a project for a client. What can be concluded about the project at week 10?

 
 
 
 

NEW QUESTION 45
What is the bearing capacity of soil?

 
 
 
 

NEW QUESTION 46
A contractor fails to make the necessary repairs on the deficiency list within the specified timeline and refuses to return to the site. How should the owner proceed in this situation?

 
 
 
 

NEW QUESTION 47
What information is provided by a 5-point Proctor density test on a soil sample?

 
 
 
 

NEW QUESTION 48
Which factor aggravates a freeze-thaw cycle and contributes to asphalt pavement deterioration?

 
 
 
 

NEW QUESTION 49
The road cross sections shown have chainage (CH) 1+100 and 1+200. What is the volume of sub-grade material if an averaging method is applied?

 
 
 
 

Civil-Engineering-Technology are Available for Instant Access: https://www.test4engine.com/Civil-Engineering-Technology_exam-latest-braindumps.html

         

Related Links: www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt disqus.com www.stes.tyc.edu.tw myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below