Get The Most Updated PSPO-I Dumps To Professional Scrum Product Owner Certification [Q57-Q76]

Rate this post

Get The Most Updated PSPO-I Dumps To Professional Scrum Product Owner Certification

Scrum Certified PSPO-I  Dumps Questions Valid PSPO-I Materials

The Scrum PSPO-I (Professional Scrum Product Owner I) certification exam is a globally recognized certification for product owners who want to demonstrate their knowledge and expertise in Scrum methodology. The certification exam was developed by Scrum.org, the leading and most reputable organization in Scrum training and certification.

 

NO.57 How many developers are in a scrum team?

 
 
 

NO.58 Which of the following actions should a Scrum Master do to start a new Project?

 
 
 
 

NO.59 Which of the following is needed for starting a new Sprint Planning?

 
 
 
 

NO.60 How is budgeting done in a Scrum Project?

 
 
 

NO.61 The Sprint length can be 6 weeks.

 
 

NO.62 What happens with “Done” Sprint Backlog items when a Sprint was cancelled?

 
 
 

NO.63 The Product Owner is responsible to define the Definition of Ready.

 
 

NO.64 Sprint cancellations are often traumatic to the Scrum Team, and are very uncommon.

 
 

NO.65 Two Scrum Teams are working on the same product. Do they have to share the same Definition of Ready?

 
 

NO.66 The Scrum Master is not important anymore if teams are self-managed.

 
 

NO.67 When n Scrum teams are working on a product, there are n Sprint Backlogs but only 1 Product Backlog.

 
 

NO.68 The Sprint Goal is created during the Sprint Review and then added to the Sprint Backlog.

 
 

NO.69 The Sprint Review is an opportunity for inspecting and adapting in Scrum?

 
 

NO.70 Who is allowed to cancel a Sprint?

 
 
 
 

NO.71 The Product Owner can nominate a “Lead Developer” as a single point of contact.

 
 

NO.72 In which case can a Sprint be cancelled?

 
 
 

NO.73 The Sprint Retrospective should be held at the same time and place to reduce complexity.

 
 

NO.74 Which of the following are required by Scrum?

 
 
 
 
 

NO.75 The Sprint is a time boxed Scrum event.

 
 

NO.76 Which of the following best describes the Scrum Pillar “Transparency”?

 
 
 

PSPO-I Premium PDF & Test Engine Files with 453 Questions & Answers: https://www.test4engine.com/PSPO-I_exam-latest-braindumps.html

         