2022 New AACE-PSP Exam Questions Real AACE International Dumps [Q31-Q45]

Rate this post

2022 New AACE-PSP  Exam Questions Real AACE International Dumps

Course 2022 AACE-PSP Test Prep Training Practice Exam Download

Q31. Determine the correct formula and date for the late start for Activity 9001.

 
 
 
 

Q32. What does the narrow band at “Y” represent?

 
 
 
 

Q33. Which of the following phases does NOT describe the commonly accepted construction life cycle?

 
 
 
 

Q34. Each of the following accurately describes total float in a schedule EXCEPT:

 
 
 
 

Q35. Scenario:
The entire network consists of the following activities and relationships. Activity A is twenty days long and is tied to Activity B, a ten-day activity, with a finish-to-finish tie with a lag value of five Activity B is tied to Activity C, a twenty-day activity, with a start-to-start relationship with a lag value of five.

PSP Activities Table
Scope Known about Rock-Filled Dam Project:
The dam requires river diversion and work over two or more rainy seasons. The contract is lump sum, competitively bid, and will be self-performed. The owner has attempted to shift all risk to the contractor by employing “no differing sit conditions” and “no damage for delay” clauses. There is a bonus/penalty provision of $2,500 per calendar day for early or late delivery. The early completion bonus is capped at $500,000, with no cap for late delivery penalty.
Liquidated damages end at the finish of demobilization. Indirect costs per calendar day are $2,800 for the
“normal” schedule and $3,200 for the “crashed” schedule. The winter/wet weather season is 151 days between October 15 and March 25 of each year, reduces the efficiency of the contractor’s operations by 20% and costs the contractor $10,000 per day. Assume a start date of March 5, 2001 and use a 7-day work week.
The following table lists work activities as planned by the contractor.

Theoretically construct a summary activity for only those activities with a finish-to-start relationship for Activities 8001 through 10001. Using the “normal” schedule, what is the cost of this hammock?

 
 
 
 

Q36. The sum of all budgets for work scheduled to be accomplished within a given time period is the
____________.

 
 
 
 

Q37. Project delays are best analyzed

 
 
 
 

Q38. What is a key first step in developing a critical path method schedule?

 
 
 
 

Q39. For which of these delays should an owner grant a time extension?

 
 
 
 

Q40. When resource leveling craft labor for a critical path schedule, the scheduler

 
 
 
 

Q41. In a “crashed” schedule, which is a chain of activities that precede activity 2004?

 
 
 
 

Q42. Assuming that you had only one crane capable of 30 lifts per day, 3 column pours requiring 28 lifts each, plus associated assorted work requiring an additional 150 lifts, what is the minimum planned working duration for this work?

 
 
 
 

Q43. Budgeted cost of work scheduled is _______________________.

 
 
 
 

Q44. Activity C is a

 
 
 
 

Q45. Activity durations are normally estimated in an intuitive and subjective way. All of the following will improve duration accuracy EXCEPT

 
 
 
 

AACE-PSP Exam Info and Free Practice Test Professional Quiz Study Materials: https://www.test4engine.com/AACE-PSP_exam-latest-braindumps.html

         